You choose, we deliver
If you are interested in this story, you might be interested in others from The Journal Gazette. Go to www.journalgazette.net/newsletter and pick the subjects you care most about. We'll deliver your customized daily news report at 3 a.m. Fort Wayne time, right to your email.

Colleges

  • Toledo storms past Ball State
    It was wet and wild – and disappointing – for the Ball State State football team, which lost to the Toledo Rockets 34-23 in a game that finished at 12:45 a.m. Sunday.
  • Ball State falls to Toledo, 34-23
    TOLEDO – It was a wet and wild night and disappointing night and early morning for the Ball State football team.
  • Winstonless Seminoles need OT to top Tigers
    With Heisman Trophy winner Jameis Winston watching from the sideline, No. 1 Florida State come back to beat No. 22 Clemson 23-17 in overtime on Karlos Williams’ 12-yard touchdown run Saturday night.
Advertisement

Bits of Rubber Bowl to be sold

AKRON, Ohio – Goal posts, weathered bleachers, lockers, toilets and turf will be for sale this weekend when pieces of the University of Akron’s old football stadium hit the auction block.

Iron gates, food carts, sound systems and signs from the 73-year-old Rubber Bowl also are up for grabs Saturday, auctioneer Glenn Witchey told the Akron Beacon Journal (http://bit.ly/1aC0ShR ).

“If it’s not concrete, it’s pretty much going to go,” Witchey said.

The university moved its football team to InfoCision Stadium on campus in 2009 and sold the deteriorating stadium to Team 1 Marketing of Canton for $38,000 in May.

The biggest draw at the auction is expected to be the stadium’s turf, which was appraised at $180,000, said Team 1’s president, Sean Mason.

The horseshoe-shaped facility built in the late 1930s is now marred by graffiti, weeds and crumbling concrete, but Team 1 hopes to renovate it for use for football games, concerts and other events.

Investors plan to supply $10 million to $12 million for new turf, an aluminum overdeck system and a pre-fabricated press box, Mason said. They also are considering adding a dome, at a price of about $15 million to $20 million, so the stadium could be used year-round, he said.

The company hopes to start construction by the end of November and complete it in time for a July 4 concert and fireworks.

Team 1 doesn’t have a right to the Rubber Bowl name and is talking to companies about purchasing the naming rights, Mason said.

Advertisement